This past week we saw the alley taking form with the exposed aggregate section extending from the alley to Second Avenue. Gravel is down in the parking lot area, a final step before cement is poured. The front steps, long damaged, were removed and will be replaced. In the meantime, the old front steps are being used in the greenhouse. Speaking of the greenhouse, a layer of sand was added on top of the insulation in preparation for the brick flooring. The balconies are beginning to be reconstructed. Inside the units, we have reached the ‘paint’ stage, as the window trim is getting a coat of white paint.
Here’s a look at this week’s work.