Construction Update: Week of July 28, 2014

Construction has been keeping up a brisk pace the past couple of weeks, with favorable weather and a good crew helping to move things along. Signs of the work are obvious from the outside – the elevator tower has grown to meet the roof, and the rooftop cabins are getting sided quickly – but inside essential work is taking place, too. Plumbing and electrical systems are continuing to multiply throughout the building, and insulation is being added to the ceilings. Here are a few photos from the week.

A front shot of the building.

[singlepic id=271 w= h= float=center]

New siding on the rooftop cabins.

[singlepic id=281 w= h= float=center]

View from inside a rooftop cabin.

[singlepic id=274 w= h= float=center]

The elevator tower reaches the roof.

[singlepic id=279 w= h= float=center]

Insulation goes in the ceilings.

[singlepic id=284 w= h= float=center]

A foundation is laid for the greenhouse.

[singlepic id=277 w= h= float=center]

And finally, a great view for the workers on the roof!

[singlepic id=276 w= h= float=center]