Construction has been keeping up a brisk pace the past couple of weeks, with favorable weather and a good crew helping to move things along. Signs of the work are obvious from the outside – the elevator tower has grown to meet the roof, and the rooftop cabins are getting sided quickly – but inside essential work is taking place, too. Plumbing and electrical systems are continuing to multiply throughout the building, and insulation is being added to the ceilings. Here are a few photos from the week.
A front shot of the building.
[singlepic id=271 w= h= float=center]
New siding on the rooftop cabins.
[singlepic id=281 w= h= float=center]
View from inside a rooftop cabin.
[singlepic id=274 w= h= float=center]
The elevator tower reaches the roof.
[singlepic id=279 w= h= float=center]
Insulation goes in the ceilings.
[singlepic id=284 w= h= float=center]
A foundation is laid for the greenhouse.
[singlepic id=277 w= h= float=center]
And finally, a great view for the workers on the roof!